After a succession of eight separate earthquake simulations, a 110-foot long, 200-ton concrete bridge model at the University of Nevada, Reno withstood a powerful jolting, three times the acceleration ...
At 11:04 a.m. on Dec. 11 a rumbling was heard at the east side of the University of Nevada, Reno as an “earthquake” shook a four-span 110-foot concrete bridge with motions comparable to an 8.0 ...
Keywords: Accelerated bridge construction (ABC). Precast concrete. Segmental bridges. Seismic design. Shaking table tests. Vertical loads. Two-dimensional (2D) models. Nonlinear dynamic analyses.
The 200-ton, four-span bridge was built over several months atop the 14-foot square shake tables at the world-renowned University of Nevada, Reno large-structures lab. The innovative bridge was hit ...
A new bridge that was completely 3D printed has just opened in the Netherlands. Designed and built by engineers from the Technical University of Eindhoven and construction company BAM Infra, the ...
Concrete highway bridges (reinforced and prestressed) are a major component in the U.S. transportation infrastructure. Their deterioration can occur in various damage mechanisms including: mechanical ...
RENO, Nev. – After a succession of eight separate earthquake simulations, a 110-foot long, 200-ton concrete bridge model at the University of Nevada, Reno withstood a powerful jolting, three times the ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results